Manufacturing guide
Supplement Contract Manufacturing Lead Times: From Brief to Finished Product
At BIO PAK Contract Manufacturing Ltd, the typical lead time for a private label supplement is 8 to 12 weeks, counted from the confirmed order. This applies to standard capsules as well as to liquid filled hard capsules and dual capsules. Raw materials, packaging, analyses and artwork approval are the factors that most often move the date.

What the 8 to 12 weeks cover
The lead time starts with the confirmed order. From that point, the work follows the same sequence for every product.
- 1
Order and planning
We confirm the order, agree the timeline with you and schedule production.
- 2
Raw material sourcing
We source the ingredients ourselves and check them against their specifications.
- 3
Filling and production
Filling and production on our automatic filling machines.
- 4
Quality control
Retention samples of every batch are kept in our sample bank, and batches are selected at random for analysis in line with our ISO 22000 and FSSC 22000 system.
- 5
Packaging
Packaging in bottles or blisters with your label.
- 6
Release and dispatch
Release once the batch documentation has been reviewed, then shipment to the address you choose.
Development and sampling happen before this clock starts. Their duration depends on the project, so we agree a plan with you at the start rather than quote a fixed figure.
Liquid filled and dual capsules
At BIO PAK, liquid filled hard capsules and dual capsules are typically produced in 8 to 12 weeks from the confirmed order, the same as standard capsules. Our guide to capsule in capsule supplements explains what can be combined in a dual capsule.
Factors that affect timing
The factors below apply across the industry. They are general guidance, and the exact effect on your project depends on the ingredients and the packaging you choose.
- Raw materials
- Availability and supplier lead times vary, and new ingredients need specifications and certificates of analysis
- Share ingredient specifications early and stay flexible on suppliers where possible
- Packaging
- Printed labels, custom bottles and blister foils have to be produced before packing, and their timing depends on the supplier
- Approve packaging early or use standard bottles
- Analyses
- Where a product needs specific analyses, external laboratory tests add time, which we confirm per project
- Agree any product specific analyses at the quote stage
- Artwork approval
- Packaging cannot be completed until the artwork is approved, and each round of corrections adds time
- Check the label text against EU labelling rules before submitting
- Formulation changes
- A change after the order is confirmed can restart sourcing and planning
- Finalise the formulation before ordering
Each factor in more detail
Raw materials
Most delays in the industry start with raw materials. Availability varies by ingredient, and less common ingredients or specific grades can take longer to source. Tell us early if your formulation relies on a specific supplier or grade.
Packaging
Standard bottles and blisters are usually the easiest to plan. Printed materials and custom packaging have to be designed, approved and produced before filling can be completed.
Quality control and analyses
Our production is certified to FSSC 22000 and ISO 22000, confirmed for GMP and HACCP and registered with the U.S. FDA. As a certified EU organic operator, we produce both conventional and organic supplements. Retention samples of every batch are kept in our sample bank in case of a complaint, and in line with this system, batches are selected at random for analysis. If your product or market calls for specific analyses, we agree them with you at the quote stage, because external tests add time.
Artwork approval
Label artwork is often the step brands underestimate. EU labelling rules for food supplements set out what must appear on the pack, and checking the text before submitting avoids extra rounds of corrections. BIO PAK does not give legal advice, so we recommend a regulatory review of your label.
Before the clock starts: brief, quote and development
A complete brief shortens the time to a quote and to a final formulation. It helps to know the capsule size and fill weight early, which our guide to capsule sizes for 500 mg explains, and the minimum quantity per product, which our guide to MOQ covers. As a rule, our MOQ is 100,000 capsules per product.
Repeat orders
For a repeat order with an unchanged formulation and artwork, the development and approval steps are already done, which makes it simpler to plan. We confirm the timeline for each order. Planning repeat orders in good time, with a view of your stock, keeps your shelves supplied.
How to keep your project on schedule
- Send a complete briefSend a complete brief with ingredients, amounts, pack size and packaging.
- Finalise the formulationFinalise the formulation before you confirm the order.
- Prepare your label text earlyPrepare your label text early and have it reviewed.
- Keep approval rounds shortApprove packaging and artwork in as few rounds as possible.
- Share your launch dateTell us your target launch date so we can plan backwards from it.
Production takes place on 8 fully automatic filling machines in our own facility in Kranj, Slovenia, with a capacity of over 500 million capsules a year.
Frequently asked questions
How long does private label supplement production take at BIO PAK?
Typically 8 to 12 weeks, counted from the confirmed order.
Does the lead time also apply to liquid filled and dual capsules?
Yes. At BIO PAK, liquid filled hard capsules and dual capsules are typically produced in 8 to 12 weeks from the confirmed order, the same as standard capsules.
When does the lead time start?
With the confirmed order. Development and sampling happen before that, and changes to the formulation or artwork after confirmation can move the date.
What can delay a supplement project?
As general guidance, the most common factors are raw material availability, packaging production, product specific analyses, rounds of artwork corrections and formulation changes after the order is confirmed.
How long does formulation development take?
It depends on the project, so it is not part of the 8 to 12 weeks. We agree a development plan with you at the start.
What changes for a repeat order?
With an unchanged formulation and artwork, development and approval are already done, which makes a repeat order simpler to plan. We confirm the timeline for each order.
Request samples or a short call
If you have a launch date in mind, you are welcome to request samples or a short call through our contact page.